Subprocess: Project Phase B
Purpose: : During Phase B, the project team completes its preliminary design and technology development. These activities are focused toward completing the Project Plan and Preliminary Design Review (PDR)/Non-Advocate Review (NAR). The PDR/NAR process culminates in KDP C.
Organization: ORG
Task |
Purpose |
Suggested Roles |
Task Lead(s) |
Estimated Completion Date |
Actual Completion Date |
Documents |
|||||
---|---|---|---|---|---|---|---|---|---|---|---|
Document |
Instructions and Samples |
Document Lead(s) |
Estimated Completion Date |
Actual Completion Date |
Document Location(s) |
||||||
Administration |
The purpose of this task is to provide basic administrative subtasks such as user and document management. |
Phase B Manager, |
Document Library |
||||||||
Headquarters and Program Products |
The purpose of this task is to provide Headquarters and Program-level products for the Flight Project. |
Phase B Manager,
|
Program Requirements on the Project Plan (Update) |
||||||||
National Environmental Protection Act (NEPA) Compliance Documentation (Environment Assessment of Environment Impact Statement, if required) |
|||||||||||
Interagency & International Agreements (Baseline) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Project Technical Products. |
The purpose of this task is to provide Technical products for the Flight Project. |
Phase B Manager,
|
System Level Requirements (Baseline) |
||||||||
Preliminary Design Report (Baseline) |
|||||||||||
Missions Operations Report. (Baseline) |
|||||||||||
Technical Readiness Assessment Report (Baseline) |
|||||||||||
Missile System Pre-Launch Safety Package (Preliminary) |
|||||||||||
Orbital Debris Assessment (Preliminary) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Project Planning, Cost, and Schedule Products |
The purpose of this task is to provide Planning, Cost, and Schedule products for the Flight Project. |
Phase B Manager,
|
Work Agreement for Next Phase (Baseline) |
||||||||
Integrated Baseline (Preliminary) |
|||||||||||
Project Plan (Preliminary) |
|||||||||||
Cost Analysis Data Requirement (CADRe) (Preliminary) |
|||||||||||
Preliminary Protection Plan (Planetary Protection Certification) |
|||||||||||
Business Case Analysys for Infrastructure. (Baseline) |
|||||||||||
Range Safety Risk Management Plan. (Preliminary) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Key Decision Point (KDP) Readiness Products |
The purpose of this task is to provide Key Decision Point (KDP) Readiness products for the Flight Project. |
Phase B Manager,
|
Standing Review Board Report (RB) (Final) |
||||||||
Project Manager Recommendation (includes response to SRB Report, as applicable) (Final) |
|||||||||||
CMC Recommendation (Final) |
|||||||||||
Project Manager Recommendation (Final) |
|||||||||||
MD-PMC Recommendations (for Category I Projects, only) (Final) |
|||||||||||
Governing PMC Recommendation (Final) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
NPR 7120.5D Project Plan-Control Plans |
The purpose of this task is to provide NPR 7120.5D Project Plan-Control Plans products for the Flight Project. |
Phase B Manager,
|
Technical, Schedule, and Cost Control Plan (Preliminary) |
||||||||
Safety and Mission Assurance Plan (Preliminary) |
|||||||||||
Risk Management Plan (Preliminary) |
|||||||||||
Acquisition Plan (Preliminary) |
|||||||||||
Technology Development Plan (Baseline) |
|||||||||||
Systems Engineering Management Plan (Baseline) |
|||||||||||
Software Management Plan (Preliminary) |
|||||||||||
Review Plan (Preliminary) |
|||||||||||
Missions Operations Plan (Preliminary) |
|||||||||||
Environment Management Plan (Baseline) |
|||||||||||
Logistics Plan (Preliminary) |
|||||||||||
Science Data Management Plan (Preliminary) |
|||||||||||
Information and Configuration Management Plan (Preliminary) |
|||||||||||
Security Plan (Preliminary) |
|||||||||||
Export Control Plan (Preliminary) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Review Packages |
The purpose of this task is to provide Review Packages products for the Flight Project. |
Phase B Manager,
|
Key Decision Point (KDP) C Package |
||||||||
Baseline Project Plan Review Package |
|||||||||||
Preliminary Design Review (PDR) Package |
|||||||||||
Non-Advocate Review (NAR) Package |
|||||||||||
Peer Review (MCR) Package |
|||||||||||
Subsystem Preliminary Design Review (PDR) Package |
|||||||||||
Subsystem Critical Design Review (CDR) Package |
|||||||||||
System Review (SR) Package |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Analysis |
The purpose of this task is to generate reports from the data resulting from the subprocess. |
Phase A Manager, |
Administration Reports |
||||||||
Headquarters and Program Reports |
|||||||||||
Project Technical Reports |
|||||||||||
Project Planning, Cost, and Schedule Reports |
|||||||||||
Key Decision Point (KDP) Readiness Reports |
|||||||||||
NPR 7120.5D Project Plan-Control Plans Reports |
|||||||||||
Review Packages Reports |
|||||||||||
Reviews |
|||||||||||
Approvals |
Mockup (html)
Implementation (html)